Decommissioning & Demolition

PROJECT OVERVIEW:
Work Site September 2, 2009

Space Launch Complex 12 Blockhouse Demolition and Decommissioning
Cape Canaveral AFS, FL

  • Asbestos, PCB Transformers, and PCB Paint Sampling & Abatement
  • Removal and preservation of historic of Blockhouse Periscopes
  • Universal waste survey and removal
  • Blockhouse Demolition
    • Consisted of 4 ft thick Concrete Inner Shell, 1 ft thick Concrete Outer Shell with 10 ft thick sand fill
    • Steel Vault Access Door
    • Over 5,000 tons of concrete and 5,000 tons of sand fill
  • Recycling & Reuse
    • Processed > 5,000 tons of concrete to reusable rip rap
    • Recycled > 10,000 lbs of metal/recyclables